Karaj highway widening project

Width length 10 km

Width  8 meters

Employer: Ministry of Roads and Urban Development

Project: Interchange of Lashkari Hyw – Iran Khodro Hyw

Bridge: plate girder Box Beam

Bridge length: 100 Meters

Width: 26 meters

Foundation: Concrete pile

Year 2012

Client: Tehran Municipality

Project: Interchange of Lashkari Hyw – Iran Khodro Hyw

Bridge: plate girder Box Beam

Bridge length: 100 Meters

Width: 26 meters

Year 2012

Client: Municipality of Tehran

Dolatabad Bridge

Bridge ramp, retaining wall ramp

Imam Ali Highway Bridge – Rey city route

Employer of Tehran Municipality

Bridge with metal beam and concrete slab

The length of the bridge is 40 meters. Bridge width 26 meters

Intersection of Imam Ali Highway – Dolatabad Highway

 Three sets of concrete bridges with prestressed concrete decks

Span of each bridge: 5 45-meter spans with a total length of 230 meters.

Finishing wall  with stone

 

Project: Hemat Hyw Tunnel (underpass)

structure: Concrete

length: 100 Meters

Width: 11 Meters

Year 2015

Client: Municipality of Tehran

Bridge deck shooting operation

Three-span bridge 100 meters long

Supply of 26 meters bridge

6 beam boxes (plate girder) beam height 160 cm

Steel st37

Bridge Lashkari Boulevard – Iran Khodro Crossroads.

Metal deck.

Year 2014

Employer of Tehran Municipality

Project: Jalal Al-Ahmad Watercourse Bridge

Bridge: Plate Girder Beam, Concrete Slab

Bridge length: 25 Meters

Width: 56 meters

Foundation: Concrete pile

Project: Jalal Al-Ahmad Watercourse Bridge

Bridge: Plate Girder Beam, Concrete Slab

Bridge length: 25 Meters

Width: 56 meters

Foundation: Concrete pile

Year 2010

Client: Municipality of Tehran

Karaj highway widening  project

length: 10 km

Widening:  8 meters

Client : Ministry of Roads and Urban Development

Project: Karaj highway widening project

length: 10 km

Widening:  8 meters

Client: Ministry of Roads and Urban Development

Modares Highway Wall Construction Project – Africa Boulevard

The height of the concrete wall is 7 meters

Project: Highway Wall Construction , Modares Hyw

length: 200 Meters

Height: 6 meters

Year 2010

Client: Municipality of Tehran

Nahj al-Balagha Park sidewalk suspension bridge

Employer of Tehran Municipality

Bridge span: 320 meters

Deck: Metal beam box

Base: Two metal pylons

Bridge cable: 45 mm cable view

Photo: Cable connection to concrete weight

Project: Interchange of Niayesh Hyw – City Boulevard

Bridge: Concrete Beam

Bridge length: 120 Meters

Width: 20 meters

Ramp : 300 Meters

Year 2013

Client: Tehran Municipality

Reinforce Soil Ramp wall

Project: Interchange of South Hyw – Dolatabad Hyw

Bridge: Post Tension Bridge

Bridge length:3 Set Bridges, 5 Span, 230 Meters

Width: 26 meters

Foundation: Group Concrete pile

Year 2014

Client: Municipality of Tehran

Project: Interchange of South Hyw – Rey Watercourse

Bridge: Plate Girder Beam, Concrete Slab

Bridge length: 40 Meter

Width: 26 meters

Year 2012

Client: Municipality of Tehran

Project: Interchange of South Hyw – Dolatabad Hyw

Bridge: Post Tension Bridge

Bridge length:3 Set Bridges, 5 Span, 230 Meters

Width: 26 meters

Year 2014

Client: Municipality of Tehran

Project: Hemat Hyw Tunnel (underpass)

structure: Concrete

length: 100 Meters

Width: 11 Meters

Year 2015

Client: Municipality of Tehran

U-turn project of Nawab-Gisha highway

Concrete underpass with concrete wall

Length under the passage 100 meters

The length of each ramp is 300 meters

Client: Tehran Municipality